RMLP - Rowley Municipal Lighting Plant

Massachusetts Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

During a billing period, if the Interconnecting Customer uses more electricity than it generates, the Customer will be billed based on the rate applicable to the their class of service. If during a billing period the Customer generates more electricity than they have used, the Customer will be billed the minimum charge applicable to the Customer’s class of service and be credited for the excess electricity generated and fed onto RMLP’s system by multiplying the excess electricity generated and measured in kilowatts by the wholesale cost of energy only, excluding transmission cost. Any credit will appear on the customer’s next monthly invoice as a line item with the nomenclature “Net Metering Credit”.

Rebates Offered
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

In no circumstances shall the output from the net metering facility be sold to a third party or credited to a third party or another RMLP customer

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

refer to pg. 4-5 in net metering policy

Electric Service Reqs

refer to pg. 4-5 in net metering policy

Website
link
Phone
(978) 948-3992

Other details

Restrict Inspection
0
Address ID
124743
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with RMLP - Rowley Municipal Lighting Plant before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.