North Attleborough Electric Department

Massachusetts Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Rebates Offered
0
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
90
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

The AC nameplate rating of the Facility may not exceed 90% of Customer’s highest demand peak (as determined solely by NAED) for the twelve month period preceding the date on which Customer signs the Application set forth in Attachment 1 and each anniversary thereof or 500 kW, whichever is lower;

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

An electrical one line diagram or sketch showing major pieces of equipment and how they will be interconnected relative to the service entrance panel and electric revenue meter

Electric Service Reqs

As-Built Drawings: Before service commences under this Tariff and before the Facility may be energized, Customer shall provide NAED with an as-built drawing of the Facility

Website
link
Phone
(508) 643-6300

Other details

Restrict Inspection
0
Address ID
125058
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with North Attleborough Electric Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.