Hull Municipal Light Plant
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Automatic Transformer Upgrade Size Type
- kW AC
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 1
- Offset Type
- Percentage
- Offset Value
- 80
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
80% of the addresses peak demand based off historic AMI data.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- SLD Reqs
PV meter wired top toward inverter, bottom toward disconnect
- Electric Service Reqs
The Interconnecting Customer shall furnish and install, if not already in place, the necessary meter socket(s) and wiring in accordance with accepted electrical standards, and HMLP one-line diagram for Interconnecting Facilities.
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (781) 925-0051
Other details
- Restrict Inspection
- 0
- Address ID
- 125931
- Express Planset Eligible
- No