Holden Municipal Light Department

Massachusetts Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The Department shall bill a customer at the designated service rate if in any Billing period, the kWh consumed by the customer exceeds the kWh generated by the Net Metering Facility. 

The Department shall credit the customer's account at the designated service rate if in any Billing period, the kWh generated exceeds the kWh consumed by the customer. Net metering customers will receive monetary credits to their electric account for their excess generation based on their class of service. 

Upon the customer's request, for the billing period ending in March of each year (or at termination of service), any remaining credit balance in a net metering account will be returned to the customer by check. The customer charge, Net Metering Distribution Charge, and minimum charge associated with the customer's class of service will still apply. 

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

refer pg 1-2 in Net Metering Policy

SLD Reqs

refer pg 1-2 in Net Metering Policy

Electric Service Reqs

The net metering facility must be to offset all or part of the customer's own electric power requirements and may not exceed 100% of the customer’s needs. Under no circumstance shall the output from the net metering facility be sold to a third party or credited to a third party or another Holden Municipal Light Department (“HMLD”) customer.

Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(508) 210-5400

Other details

Revision Required
No
Mod Swap Requires Planset
Yes