Belmont Municipal Light Department

Massachusetts Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
NEM TypeN/A
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredNo

Net metering & export

Net Metering Allowed
No
NEM Type
N/A
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.13
Solar Export Value Notes
Rate changes as needed, current rate can be found in their website
Net Excess Generation Notes

Belmont Light will purchase all Excess Energy metered by Belmont Light at a fixed rate - current rate can be found on their website.

Rebates Offered
No
Deregulated
Yes
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
No
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

One-line diagram showing facility interconnection, main utility metering and any premises sub-metering. One‐line diagram and data sheets indicating IEEE 1547 /UL1741 listing. Documentation for inverters, panels, batteries, or other applicable equipment must be submitted

Electric Service Reqs

Belmont Light’s distribution circuits generally operate with automatic re‐closers, which activate following a trip without regard to whether the Facility is keeping the circuit energized. The Interconnecting Customer is responsible for protecting their equipment from being re‐connected out of synch with Belmont Light's system. For Facilities that utilize photovoltaic (PV) technology: It is required that the system be installed in compliance with IEEE Standard 929‐ 2000, “IEEE Recommended Practice for Utility Interface of (PV) Systems” or the applicable updated standard. The inverter shall meet the Underwriters Laboratories Inc. Standard UL 1741, “Static Inverters and Charge Controllers for Use in PV Power Systems” or the applicable updated standard.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
Yes
ESID Num Req SLD 3LD
No
Website
link
Phone
(617) 993-2800

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Belmont Municipal Light Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.