Ashburnham Municipal Light Plant
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Rebates Offered
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Customer-generators served under the RDGP are limited to a rated system capacity of 10 kW (DC), not to exceed 80% of the customer’s average load. Average load will be determined solely by the AMLP and will be based upon the most recent 24 months of billing history if available
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- PV must not be affected by shading from 1pm to 5 pm June 1st to September 1st. Maximum peak output of the generating installations covered by this policy is 10 kW (DC)
- SLD Reqs
- An electrical one-line diagram or sketch depicting how the inverter will be interconnected relative to the service entrance panel and the electric revenue meter. The diagram must show all devices for the system, including equipment ratings, wire sizes and a visible accessible and lockable disconnect switch (“knife blade safety switch”). The disconnect switch must be installed outdoors, adjacent to, and within view of the AMLP’s revenue meter, where utility personnel can operate the switch if required.
- Website
- link
- Phone
- (978) 827-4423
Other details
- Restrict Inspection
- 0
- Address ID
- 126609
- Express Planset Eligible