Kansas Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Energy exported to Evergy and power supplied by Evergy is monitored through a bi-directional meter. Through one-for-one net metering, exported energy is used to offset an equal amount of power supplied by Evergy during the billing period. Excess energy is credited the avoided cost.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Tap Criteria

Review the POC with Tap Box and without Tap Box Diagrams uploaded to the files section

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
15
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Customers generator shall be sized to offset part, or all, of the customer generators own electrical requirements.

15kW AC is the max for residential system to be eligible for Net Metering.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Allowed Meter Adapter
Tesla Backup Switch,ConnectDER

Plans & docs

Site Plan Reqs

The plan or map must identify the location of the source of generation, any existing generation, energy storage, associated meters, production meter, and solar disconnect.

SLD Reqs

Diagrams should include: resource type, existing generation, storage devices, inverters, load center, production meter, disconnect switch, and revenue meter.

Install Reqs

Disconnect Required

Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(816) 242-5971

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Evergy Kansas before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.