Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Tri-County Electric Cooperative, Inc (IL)

Illinois Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed0
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the eligible member is a net seller of electricity during the billing period, the cooperative will calculate a monetary credit for any metered excess kilowatt-hours of electric energy delivered to the cooperative at a rate equal to the per kilowatt-hour energy charge as shown on the applicable month's SIPC power bill and apply such credit against only the electric energy charges derived specifically from the consumption of electric energy measured in units of kilowatt hours as denoted on a subsequent bill for service to the eligible member. The cooperative shall continue to carry over any unused amount of such credits and apply those credits to subsequent billing periods to offset only any electric energy-related charges derived specifically from the consumption of electric energy measured in units of kilowatt-hours due from the eligible member as denoted in the billing for those subsequent billing periods until all credits are used or until the end of the annual period, whichever occurs first.

At the end of the annual period that service is supplied by means of net metering, or in the event that the eligible member terminates service with the cooperative during an annual period, any remaining credits in the member's account shall expire and no credit or payment shall be due to the member for such expired credits.

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
40
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Required
1
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR) You will need to call our operations department ) to schedule any required temporary disconnects or reconnects. Typically we would require at least 2 days notice. No fees as long as its during business hours (8am-2pm for service calls)

TDR - Who to

TDR - Applications/Documents Req N/A

TDR - ETA of notice required for request 2 days

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR N/A

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Show the disconnect locations in relation to the meter and inverter
SLD Reqs
  • Include wiring details (wire sizes, disconnect rating)
  • Identify if the connection is line-side or load-side
Install Reqs


Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(800) 244-5151

Other details

Restrict Inspection
0
Address ID
601275
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Tri-County Electric Cooperative, Inc (IL) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.