Rural Electric Convenience Cooperative
Net metering & export
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- Project 10kWAC or less are eligible for net metering. Projects larger than 10kAC will be on an export rate.
- Net Excess Generation Notes
Any surplus or over-generation that cannot be used on the member’s premises will be metered and purchased by the cooperative at the avoided cost. The rate of compensation will be the same as others who sell generated power directly to the wholesale market. At the end of each billing cycle, the metered kilowatts
will be calculated and appear on the bill as monetary redit. Unused kilowatts will never expire or be carried over to another billing cycle, but credits may be forwarded if amount exceeds the current bill.
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
Not required for IX submittal
- SLD Reqs
This attachment must show the arrays, inverter, disconnect, meter, and Point of Interconnection. Note: If connecting to a meter loop on a pole, RECC requires a 3' clearance around its poles. The clearance also includes any conduit connected above ground.
- Electric Service Reqs
IEEE 1547
UL 1741
NFPA 70
ANSI C84.1
- Install Reqs
- If connecting to a meter loop on a pole, RECC requires a 3' clearance around its poles. The clearance also includes any conduit connected above ground. Any changes or upgrades required to the meter loop must be approved prior
- The member shall provide adequate above-ground clearance of cooperative poles. When connecting EREGF equipment to the master meter or meter loop, all wiring located within 3’ of meter pole shall be buried, except for the exposed conduit feeding into the bottom of the meter loop’s disconnect.
- Placards
Installations must be properly labeled by placing an approved placard on the cooperative’s meter base, indicating that an alternate source of energy is interconnected to the meter. An additional placard is required to identify the disconnect of the alternative energy source.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
Other details
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Express Planset Eligible
- Yes