Norris Electric Cooperative
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03005
- Net Excess Generation Notes
Rate description did not provide a breakdown of post-solar billing mechanism. When I spoke with an engineering representative at the utility, they stated specifically that it was not NET metering and that they credit at the avoided costs of $.3005/kWh exported to the grid.
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Utility Acct Holders name must be listed on the plans
- SLD Reqs
Utility Acct Holders name must be listed on the plans
- Placards
Per utility "Follow the most recent NEC code book for labels"
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Website
- link
Other details
- Restrict Inspection
- 0
- Address ID
- 2194211
- Express Planset Eligible
- Yes