Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

IL - Spoon River Electric Company

Illinois Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Net Metering Policy 600: During a billing period, any excess bill credit balance shall be applied to future billing periods, however no bill credit balance shall carry forward beyond the end of the calendar year. At the end of the annual period that service is supplied by means of net metering, or in the event that the eligible member terminates service with the cooperative during an annual period, any remaining credits in the eligible member’s account shall expire and no credit or payment shall be due to the member for such expired credits.  


Pending Net Billing Policy 601 & 602 Copy

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
0
Load Taps Allowed
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Phone
(309) 647-2700

Other details

Address ID
16436477
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with IL - Spoon River Electric Company before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.