IL - Adams Electric Cooperative

Illinois Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Net Excess Generation Notes

If the eligible member is a net seller of electricity during the billing period, the cooperative will calculate a monetary credit for any metered excess kilowatt-hours of electric energy (kWh) delivered to the cooperative at a rate equal to the HMEV corresponding to the billing period and apply such credit against only the electric Policy Bulletin No. 35 Page 4 energy charges derived specifically from the consumption of electric energy (kWh) measured in units of kilowatt-hours as denoted on a subsequent bill for service to the eligible member.

The cooperative shall continue to carry over any unused amount of such credits and apply those credits to subsequent billing periods to offset only any electric energy (kWh) charges derived specifically from the consumption of electric energy (kWh) measured in units of kilowatt-hours due from the eligible member as denoted in the billing for those subsequent billing periods until all credits are used or until the end of the annual period, whichever occurs first.

At the end of the annual period that service is supplied by means of net metering, or in the event that the eligible member terminates service with the cooperative during an annual period, any remaining credits in the eligible member’s account shall expire and no credit or payment shall be due to the member for such expired credits.


If the member has a two-meter electric heating and/or cooling rate, the rate must change to a single-meter electric rate.

Rebates Offered
0
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
100
System Size Restriction Type
AC kW
System Size Battery Included
1
System Size Includes Existing Systems
1
Offset Type
Combination
Offset Value
110
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Visible lockable AC disconnect must be installed immediately adjacent to the meter base.

SLD Reqs

Visible lockable AC disconnect must be installed immediately adjacent to the meter base.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Electrical Diagram Notes


Website
link
Phone
(217) 593-7701

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
1309205
Express Planset Eligible
Yes