EnerStar Electric Cooperative (IL)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- Electricity consumption and net generation (excess electricity put onto the grid) are metered and billed separately. Members are charged the standard retail rate per kWh when they use energy
- Rebates Offered
- No
- Deregulated
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Not required for utility submittal
- SLD Reqs
Example SLD uploaded to files
- Electric Service Reqs
- AC DISCONNECT SWITCH- All renewable energy systems must install an AC disconnect switch. It must be visible, lockable, and located with 10 feet of the MAIN BREAKER
- If installing a ground mount system, solar panels may not be installed within 10 feet of any primary underground electric service
- No additional equipment shall be added to EnerStar poles. Any other support structure such as a meter rack (H-fixture) must be at least 2 feet from any EnerStar poles
- All systems must be installed per the most current NEC
- Install Reqs
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (800) 635-4145