City of Mascoutah
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
For any excess energy generated by the customer from an approved on-site generating facility and delivered by the customer to the utility at the meter, as reflected in the meter reading, a credit shall be created and applied to the customer’s bill based upon the lesser of the full retail energy rate for the customer class and the avoided cost of energy. $0.0538 NEM Policy
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Tap Criteria
Piercing connectors not allowed
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Must be properly sized to not exceed the customers expected annual usage based on the customers current needs. Customer’s energy usage will be analyzed using 36-months of historical energy usage (if available) in order to calculate the customer’s expected annual usage. If a customer provides documentation specifying why the usage has increased over that time, such as home renovation/addition or installation of electric heating or an electric vehicle charging station on the premises, then the previous 12-month period shall be used to determine the average for the expected annual usage.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Must include location of the inverter, disconnect and POI.
- Electrical Stamp Required
- Yes
- Equipment Approvals
- California Energy Commission
- Electrical Diagram Notes
Utility requires a engineer sealed letter signing off that the trusses will hold the weight of the PV panels
- Website
- link
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes