City of Flora

Illinois Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.09
Solar Export Value Notes
Rate will be lowered to $0.05 in Q2
Net Excess Generation Notes

For any excess energy generated by the customer from an approved on-site generating facility and delivered by the customer to the utility at the meter, as reflected in the meter reading, a credit shall be created and applied to the customer's bill based upon the lesser of the full retail energy rate for the customer class and the avoided cost of energy. At the end of the annual period (April 30) any remaining credits on the customer's account shall expire.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Phone
(618) 662-8313

Other details

Address ID
5384687
Express Planset Eligible
Yes