City of Carlyle
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
For energy delivered by the utility to the customer at the meter, as reflected in the meter reading, shall be billed at the appropriate utility full retail rate.
For any excess energy generated by the customer to the utility meter, a credit shall be created and applied to the customer's bill based upon the lesser of the full retail energy rate for the customer class and the avoided cost of energy.
Unused credits are applied to subsequent billing periods to offset usage kWh until all credits are used or the end of the annual billing period (April 30).
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- The system cannot be over 100% of the customer's historical usage in the last 36 months
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC Disconnect must be accessible to the utility 24/7
- Website
- link
- Phone
- (618) 594-5215
Other details
- Address ID
- 1161439
- Express Planset Eligible
- Yes