United Electric Cooperative, Inc. (ID)

Idaho Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Solar Export Rate
0.3768
Net Excess Generation Notes

Member generation in excess of monthly energy usage, measured in kilowatt-hours (kWh) multiplied by the Net Metering Energy Rate, will be carried forward on a monthly basis as a generation credit and will be applied to the member’s monthly billed Energy Charge. This credit can be carried forward up to twelve (12) consecutive months, ending on the Net Metering year as determined by United Electric. At the end of the Net Metering year any remaining accumulated generation credit shall be given to United Electric without compensation to the member.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

They recently changed it to 100% offset OR up to 25 kW (whichever is less).

TDR Process We require a temporary disconnect connected to or integrated into the meter base. It must be properly labeled. I believe this will be required to pass the state inspection.

TDR - Who to Contact N/A

TDR - Applications/Documents Req N/A

TDR - ETA of notice required for request N/A

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR N/A

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

The utility will install and seal the Net Meter at the time of Final inspection by the utility

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

One-Line needs to show the equipment connected to our service. Provide what you typically provide and we will let you know if more is required

Electric Service Reqs

If we determine that a transformer upgrade is needed we will provide the new transformer as part of the service.

Install Reqs

Typically we require a 4 terminal meterbase rated for the service size, it can have a separate or integrated disconnect (Meter Main)

Rate Schedule Link
link
Website
link
Phone
(208) 679-2222

Other details

Restrict Inspection
0
Revision Required
1
Address ID
277725
Express Planset Eligible
Yes