RMP - Rocky Mountain Power (ID)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- Yes
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
At the end of the customer’s February billing period the customer may request to transfer the unused financial credits to offset energy charges at the customer’s other eligible meters. Credits may be transferred to a meter or meters that meet the criteria
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The total combined customer generation power rating on the circuit with the addition of your system cannot exceed a reasonable portion of the total circuit annual peak load.
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Allowed Meter Adapter
- ConnectDER,Tesla Backup Switch
Plans & docs
- SLD Reqs
- Two manual-operated, unitized load-break disconnect switches located near the POI are required.
- AC Disconnects must be installed 3 ft. from the meter base. If multiple disconnects are used, IE: Battery and PV, then both must be within 3ft of meter. Show or note the distance on plans
- Your generating facility must include a UL listed AC disconnect switch that provides a visible break, is lockable in the open position, and is located between the production meter and the sub-panel or other connection to the generating facility
TAPS
- Taps not allowed in meter main combo panels
- Electric Service Reqs
Transformer Upgrade Requirements "Upgrades are not common, but it can happen. The most common upgrades are when the generation exceeds the transformer limit and a new transformer needs to be installed. High voltage could also be identified but rare.
Once an accommodation has been identified, the process goes through PowerClerk to get a work order created. Then the local ops center will work with either the contractor or customer. The cost can be billed to either the contractor or customer and who pays for it can be decided through the local office.
You do have an option to downsize to avoid the upgrade. You will need to change the information on the application. If the application has been approved, we will need to send it back to engineering review to get approval on the new information. Engineering review can typically take up to 10 business days
"
- Install Reqs
See Key Components
See PV / PV+Battery AC Disco Notes and Policy
- Equipment Approvals
- California Energy Commission
- Electrical Diagram Notes
All Jobs [AC DISCONNECT SWITCH SHALL BE A MANUAL LOAD BREAK, LOCKABLE AND ENCLOSED. IT SHALL BE USED TO ESTABLISH VISUAL OPEN WORKING CLEARANCE FOR MAINTENANCE AND REPAIR WORK IN ACCORDANCE WITH RMP RULES AND PRACTICES. IT SHALL BE LOCATED WITHIN SIGHT OF AND WITHIN 10 FEET OF THE UTILITY METER, OR AT A RMP-APPROVED LOCATION WITH ACCEPTABLE SIGNAGE INDICATING THE LOCATION OF THE DISCONNECT.]
- Website
- link
- Phone
- (888) 221-7070