Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.0358
Net Excess Generation Notes

Any reverse-metered generation as of the closing reading of any month will be credited to the consumer’s bill in accordance with the above calculation (Avoided cost = $0.0358/kWh).

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Preferably not to exceed 100% offset but can install up to 50 kW

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Electric Service Reqs

Lockable AC disconnect within 10' of the meter

Placards

For the AC disconnect it needs to clearly mark as “Generator Disconnect Switch”.

Equipment Approvals
California Energy Commission
Website
link
Phone
(208) 983-1610
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with ICL&P - Idaho County Light & Power Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.