ICL&P - Idaho County Light & Power Cooperative
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.0358
- Net Excess Generation Notes
Any reverse-metered generation as of the closing reading of any month will be credited to the consumer’s bill in accordance with the above calculation (Avoided cost = $0.0358/kWh).
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Preferably not to exceed 100% offset but can install up to 50 kW
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Electric Service Reqs
Lockable AC disconnect within 10' of the meter
- Placards
For the AC disconnect it needs to clearly mark as “Generator Disconnect Switch”.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (208) 983-1610