Fall River Rural Electric
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
With the current net metering rate, members get a one-for one credit up to what they used on a monthly basis. Excess energy gets paid out at average wholesale power costs as a credit on the account for future needs.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Members are allowed to connect up to 25kW of generation
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
TDR Process Fall River Electric will disconnect and reconnect any service supplying member-owned service equipment that must be de-energized prior to modification. There will be no charge for the disconnection if done during normal work hours. The reconnection will be done without charge if it can be completed on the initial trip or on a second trip scheduled during regular working hours, and at Fall River’s convenience; otherwise, the member will be billed a reconnection charge according to the fee schedule then in effect. Any modifications to metering equipment will require a state electrical inspection. Fall River Electric cannot reconnect unless the modifications have been certified by the State. (For your safety, only authorized Fall River Electric representatives will disconnect or reconnect facilities.)
TDR - Who to Contact Customer Service
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request 2 days
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- A site map is required to show the location of all the components
- AC Disconnect to be within 10' of the members side of the meter
- SLD Reqs
- Install Reqs
If you are installing a system on an existing Fall River Electric Service there should be an existing Fall River Electric Meter.
See Guidelines for Installation
- Placards
Placards required by NEC
- Equipment Approvals
- California Energy Commission
- Electrical Diagram Notes
All Jobs [AC Disconnect switch to be within 10' of the members side of the meter]
- Rate Schedule Link
- link
- Website
- link
- Phone
- (208) 652-7431
Other details
- Restrict Inspection
- 0
- Address ID
- 283575
- Express Planset Eligible
- Yes