Clearwater Power
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
"Net metering describes any electrical energy generated at your account that is surplus to the electrical usage at that account. This electricity flows into the Cooperative’s system and is used to serve other members. Your meter will record the difference between the electricity you buy from Clearwater Power Company (CPC) and the electricity you generate using your renewable generating equipment.
Customer-generated power is then credited at the applicable rate in kilowatt-hours (kWh) at a 1:1 ratio. These credits are applied in the billing period following the billing period of production."
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
Residential does not exceed 25kW
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Utility will install their own meters for homeowners.
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
An approved external lockable disconnecting device capable of isolating the net-metering facility from the Cooperative’s system shall be provided by the Member and shall be readily accessible to Cooperative personnel at all times. The disconnecting device shall be located within ten (10) feet of the Member’s meter and be clearly marked “Generator Disconnect Switch
- Install Reqs
The disconnecting device shall be located within ten (10) feet of the Member’s meter and be clearly marked “Generator Disconnect Switch”.
- Placards
Placards required by NEC
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (208) 743-1501
Other details
- Restrict Inspection
- 0
- Address ID
- 271513
- Express Planset Eligible
- Yes