Walton EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04
Net Excess Generation Notes

When electricity generated by the Member’s renewable resource generation system flows back onto the Cooperative’s distribution system, the Member shall be billed for appropriate customer charges for that billing period (as defined in the appropriate tariff and credited for all kWh supplied to the Cooperative during the billing period at AVOIDED ENERGY COST, with this kWh credit appearing on the bill for the billing period

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
1
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
50
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Our policy is 50KW on residential, However if the system if so large that we have to upgrade our equipment the cost is past on to the homeowner

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

All equipment and power flow

Install Reqs

The Cooperative will install single directional metering or bi-directional metering depending on how the Member is connected to the Cooperative’s distribution system.

Website
link
Phone
(770) 267-2505

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
195024
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Walton EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.