Upson EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

If the electricity consumed by the Customer Generator during the billing period exceeds the electricity generated by the customer’s distributed generation facility during the billing period, then all electricity generated by the customer generation shall be deemed to have been used by the Customer Generator. If the electricity generated by the customer’s distributed generation facility during the billing period exceeds the electricity consumed by the Customer Generator, then such excess net energy shall be purchased by the Cooperative as provided under the Purchase Rate section of this Rider

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes


Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR) "YOU OR THE CUSTOMER MUST HAVE THE ELECTRICIAN SCHEDULED FOR THE MORNING YOU PLAN TO ASK US TO CUT SERVICE LOSE. THE BUILDING INSPECTOR NEEDS TO BE NOTIFIED THAT THE WORK IS BEING DONE AND THAT YOU WILL NEED HIM TO COME OUT THAT DAY TO INSPECT.

CALL OUR OFFICE THE DAY BEFORE TO SCHEDULE US TO COME AND CUT THE SERVICE LOSE AND PULL THE METER.

ONCE THE WORK IS DONE. CALL THE BUILDING INSPECTOR.

THE BUILDING INSPECTOR WILL CALL US AND GIVE OK.

IT WOULD BE A GOOD IDEA FOR THE CUSTOMER TO CALL US AS WELL AND REQUEST THAT THE SERVICE BE RECONNECTED.

WE COME OUT AND TAP SERVICE BACK UP AND PLUG METER

TDR - Who to Contact Upson EMC CS

TDR - Applications/Documents Req N/A

TDR - ETA of notice required for request 1 day ahead

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR 1 day

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Include the project’s planned operating mode (e.g., combined heat and power, peak shaving, etc.).

Electric Service Reqs

The Customer Generator shall be capable of operating its generating equipment at a voltage level of plus/minus 6% of nominal system voltage. Utility grade negative sequence/under-voltage relaying shall be used to trip the equipment off the line for negative excursions exceeding 8.25% of nominal for a maximum duration of six electrical cycles. Positive excursions exceeding 10% of nominal voltage shall cause the equipment to trip off line. Voltage regulating equipment shall maintain stable excitation levels with negligible hunting (less than 2% of nominal phase current).

Install Reqs


Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(706) 647-5475

Other details

Restrict Inspection
0
Address ID
209534
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Upson EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.