Tri-County EMC (GA)

Georgia Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.05
Net Excess Generation Notes

. For each billing period, the member’s monthly energy consumption and generation will be metered. The cumulative kWh Delivered to the member will be metered separately from the kWh Received to the grid from the member. All Delivered kWh will be charged according to the applicable rate schedule and Received energy for that billing period will be credited by an amount per kilowatt-hour at the Cooperative’s Value of Renewable Generation as determined in accordance with Exhibit A (“Excess Energy Credit”).

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Website
link
Phone
(478) 986-8100

Other details

Restrict Inspection
0
Address ID
209517
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Tri-County EMC (GA) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.