Jefferson EMC
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- No
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Other
- Solar Export Value Notes
- $0.0547 per kWh
- Net Excess Generation Notes
All kWh delivered by the cooperative to the DG Owner/Operator shall be billed on the rate charged to the member under the applicable standard rate schedule.
All kWh received from the customer on an instantaneous basis (Excess Net Energy) will be credited on a monthly basis by the cooperative to the member per JEC’s Net Metering Service Schedule NM. Excess Net Energy cannot be "banked," "saved," or "rolled forward" for use in a future month or different time period or interval within a month.
- Rebates Offered
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Net energy metering services for peak generation capacity of not more than 10 kW AC for a residential application and 100 kW for a commercial application.
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
1. Visible break disconnect shall be adequately sized for the installation and of load break type.
2. Visible break disconnect shall be readily accessible, located outside within 5 feet of the meter. It shall have a means to be locked in the open position by JEC personnel.
3. Installation shall meet all applicable NEC and local codes.
No Production Meter Required
- Site Plan Notes
All Jobs [Visible Lockable AC disconnect located within 10' of utility meter]
- Electrical Diagram Notes
All Jobs [Visible Lockable AC disconnect located within 10' of utility meter]
- Website
- link
- Phone
- (706) 547-2167