Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Habersham EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Production that exceeds the customers' monthly usage will be credited at the Excess Generation Rate.

0.052 per kWh

$15.00 per month administrative charge

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The capacity of a distributed generation facility used by residential consumers shall not exceed 10 kW and the capacity of a distributed generation facility used by a commercial consumer shall not exceed 100 kW.

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Describe the project’s planned operating mode (e.g., combined heat and power, peak shaving, etc.), and its address or grid coordinates

SLD Reqs

Detailed one-line diagram of the proposed facility, all applicable elementary diagrams, major equipment, (generators, transformers, inverters, circuit breakers, protective relays, etc.) specifications, test reports, etc., and any other applicable drawings or documents necessary for the proper design of the interconnection

No production meter, utility meter is bi-directional

Website
link
Phone
(706) 754-2114

Other details

Restrict Inspection
0
Address ID
202592
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Habersham EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.