Grady EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.03425
Solar Export Value Notes
per kWh
Net Excess Generation Notes

If the electricity consumed by the member generator during the billing period exceeds the electricity generated by the member’s distributed generation facility during the billing period, then all electricity generated by the member generation shall be deemed to have been used by the member generator. If the electricity generated by the member’s distributed generation facility during the billing period exceeds the electricity consumed by the member generator, then such excess net energy shall be purchased by the Cooperative as provided under the Purchase Rate section of this Rider. (Avoided Cost: $0.03425 per kWh)

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

BATTERY JOBS: AC DISCONNECT REQUIRED BETWEEN POI AND MID

Website
link
Phone
(229) 377-4182

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
209174
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Grady EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.