Report a correction Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
When electricity supplied by Thomasville Utilities exceeds electricity generated by the customer's distributed generation, the electricity shall be billed by Thomasville Utilities in accordance with the tariff.
When electricity generated by the customer's distributed generation system exceeds electricity supplied by Thomasville Utilities, the customer shall be billed for appropriate customer charges for that billing period and credited for excess kWh generated during the billing period at avoided energy cost, with this kWh credit appearing on the bill for the billing period.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC disconnect must be accessible to the utility 24/7
- Production meter required
- SLD Reqs
- Must include all major equipment including, but not limited to, generators, inverters, circuit breakers, and protective relays.
- AC disconnect required
- Production meter required
- A sample line diagram is available in the database files.
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (229) 227-7001
Other details
- Revision Required
- No
- Mod Swap Requires Planset
- Yes