City of LaGrange

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The City may at its sole option, unless otherwise required by Georgia Law, subtract metered Excess Energy from energy used by the Service Location for billing purposes or credit customer for Excess Energy at a separate rate

Rebates Offered
0
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Single-phase and residential PV Systems are allowed at power levels up to 10 kWac. Commercial PV Systems are allowed at a size up to 125% of the Owner’s peal KWac demand.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Standard

Electric Service Reqs

Physical Isolation Requirements - the city has two options, listed below:

Installation of a disconnect switch.

  • Device shall be located adjacent to, and on the same wall as the location meter.
  • Must be labeled per the current version of the NEC

Utilization of the NET meter

  • Utilization of the net meter as the physical isolation by allowing city employees to remove the net meter any time the physical isolation of the PV system is required.
Placards

Refer to the latest NEC code for placard requirements. AC Disconnect must be labeled per NEC

Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0

Other details

Address ID
4092183
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of LaGrange before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.