City of Hogansville
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Solar Export Value Notes
- For kWh’s generated by Customer’s distributed generation facility, Customer shall be compensated at the City’s avoided cost of energy (kWh) as determined by the City. The City will only comp
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
PV > Inverter > AC Disco > PM > MSP > UM
- Electric Service Reqs
Breaker:
- The Customer’s over-current protective device (Breaker) at the service panel must be dedicated and must be capable of interrupting the maximum available fault current. The Breaker shall be clearly marked to indicate power source and connection to the City’s electric system.
AC Disconnect:
- Manual, lockable, load-break disconnect switch that provides a clear indication of the switch position must be available
- The City will approve the location of the disconnect switch.
- The disconnect switch must be easily visible, mounted separately from the metering equipment, readily accessible to the City personnel at all times, and capable of being locked in the open position with the City’s lock.
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (706) 637-8629
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 209735
- Express Planset Eligible
- No