City of Griffin - Electric Department
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
When electricity generated by the Customer’s distributed generation system exceeds electricity supplied by the Utility, the Customer shall be billed for the customer charges as described in the standard rate for that billing period and credited for excess kWh generated during the billing period at the Utility’s avoided energy cost.
In the event Customer develops a credit balance during a billing period, the amount will remain as a credit on the Customer’s account. Credit balances remaining at the end of the Utility’s fiscal year will be cleared by the issuance of a check for the credit balance to Customer. Any other clearance of account credit balances will be at the Utility’s discretion.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Electrical Diagram Notes
- Rate Schedule Link
- (pg 35) https://www.cityofgriffin.com/home/showpublisheddocument/1514/638507561213730000
- Website
- link
- Phone
- (770) 229-6407
Other details
- Restrict Inspection
- 0
- Address ID
- 209729
- Express Planset Eligible
- Yes