Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Fairburn

Georgia Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Net Excess Generation Notes

No solar program, customer can install solar if it doesn't negatively affect the utility grid. Electricity generated from the solar will either be consumed or exported instantaneously. Exported kWh to the grid will not be compensated.

Rebates Offered
0
Deregulated
1
Allows Standby
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Rate Schedule Link
link
Website
link
Phone
(770) 964-2244

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
209721
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Fairburn before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.