City of Cartersville
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0389
- Solar Export Value Notes
- 2022
- Net Excess Generation Notes
1. When electricity supplied by the Utility exceeds electricity generated by the Customer’s distributed generation, the electricity shall be billed by the Utility in accordance with the applicable tariff(s).
2. When electricity generated by the Customer’s distributed generation system exceeds electricity supplied by the Utility, the Customer shall be billed for the customer charges as described in the standard rate for that billing period and credited for excess kWh generated during the billing period at the Utility’s avoided energy cost
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Customer is required to provide CES a readily accessible solid blade disconnect switch adjacent to the service point on the exterior of the building suitable for a utility lock
- SLD Reqs
- Must include all major equipment including, but not limited to, generators, inverters, circuit breakers, and protective relays.
- Install Reqs
- The Owner’s over-current protective device (Breaker) at the service panel must be dedicated and must be capable of interrupting the maximum available fault current. The Breaker shall be clearly marked to indicate power source and connection to the City’s electric system.
- Placards
- AC Disconnect must be permanently marked “GENERATION DISCONNECT”
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (770) 387-5607
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 209633
- Express Planset Eligible
- Yes