Amicalola EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04
Net Excess Generation Notes

The rates paid for net energy purchased by the Cooperative shall be based upon the

Cooperative’s avoided cost of energy $0.038/kWh. A net metering account connection fee of $125.00.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Amicalola EMC offers net metering for residential systems less than 10 KW and commercial systems less than 100 KW.

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR): Call Amicalola. Once completed it must be inspected.

TDR - Who to Contact: staff

TDR - Applications/Documents: Req N/A

TDR - ETA of notice required for request: 1 day in advance

TDR - Who can schedule? Forever

TDR - ETA of Utility Scheduling TDR: N/A

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

An outside lockable blade type switch is required between the generator and the Amicalola EMC system.

The Switch must be located near the meter.

Amicalola EMC will change out the meter in the existing meter socket to a net meter. No other changes are necessary there, but we do require a PV disconnect within 5 feet of the meter base for easy access by AEMC employees if needed.


Line Side Taps allowed but not in meter can

Install Reqs

A special net meter will be installed to replace your regular meter when the system is turned on. The regular meter that is there now records generation as usage and will increase your bill instead of reducing it.

Equipment Approvals
California Energy Commission
Rate Schedule Link
link
Website
link
Phone
(706) 253-5200

Other details

Restrict Inspection
0
Address ID
194153
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Amicalola EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.