UCNSB - Utilities Commission City of New Smyrna Beach

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The conclusion of the 12th billing cycle the net balance will be paid the Customer for net excess energy delivered to the UC's system at the end of the 12 month.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Electric Service Reqs

Inverter:

Customer certifies that the RGS equipment includes a utility-interactive inverter or interconnection system equipment that ceases to interconnect with the UCNSB system upon a loss of UCNSB power. The inverter shall be considered certified for interconnected operation if it has been submitted by a manufacturer to a nationally recognized testing laboratory (NRTL) to comply with UL 1741. The NRTL shall be approved by the Occupational Safety & Health Administration (OSHA).

If Customer adds another RGS which (i) utilizes the same utility-interactive inverter for both systems; or (ii) utilizes a separate utility-interactive inverter for each system, then Customer shall provide UCNSB with sixty (60) days advance written notice of the addition.

Disconnect:

UCNSB will require Customer to install, at customer’s expense and subject to the approval of UCNSB, a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the customer-owned renewable generation system and any Customer wiring connected to UCNSB’s electric system.

The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter.

The switch shall be readily accessible to UCNSB and capable of being locked in the open position with a UCNSB padlock.

Rate Schedule Link
link
Website
link
Phone
(386) 427-1361

Other details

Restrict Inspection
0
Address ID
108132
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with UCNSB - Utilities Commission City of New Smyrna Beach before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.