TECE - Tri-County Electric Cooperative (FL)

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If a member generates more energy than they use throughout the year, TCEC will purchase any excess energy generated at Seminole Electric Cooperative's avoided costs, available at https://www.seminole-electric.com/.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

** One-line diagram must show the electrical design of the generating installation, including equipment for interconnection with the Cooperative's system

**Disconnect: **


Must install and maintain a manual disconnect switch to provide a separation point between the AC power output of the RGS and any Customer facilities connected to the Cooperative's electrical system.

Electric Service Reqs

**System Sizing**

The RGS must have a GPR that does not exceed ninety percent (90%) of the Customer's utility distribution service rating at the Customer's location.


If the GPR does exceed that ninety percent (90%) limit, the Customer shall be responsible to pay the cost of upgrades for that distribution service to accommodate the GPR capacity and to ensure the ninety percent (90%) threshold is not breached.

Website
link
Phone
(850) 973-2285

Other details

Restrict Inspection
0
Address ID
112545
Express Planset Eligible
Yes