SECO Energy

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.07
Net Excess Generation Notes

During any billing cycle, excess kWh generated by the customer's renewable generation system that is delivered to the Cooperative's electric grid will be credited to the customer at a rate equal to the base cost of power shown in Schedule PCA plus the applicable WPCA factor for the month. Should the kWh generated by the customer's renewable generation system result in a credit to the customer for the billing period, the excess will be credited to the customer's account

Rebates Offered
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Battery Jobs

  • Install one AC disconnect to isolate all generation sources, including batteries.
  • Only one disconnect per house is allowed.

Existing Systems

  • List model numbers of existing panels and inverters on the one-line diagram (SLD).

Example

  • Test Project: MICHAEL DANEHER - 400A split service with dual DG disconnects.
Electric Service Reqs
  • All solar must use a single disconnect.
  • Existing system must be combined with new solar in a combiner and controlled by one disconnecting means.
Placards
  • Meter Can: A red and white placard riveted to the meter can: "Dual Power Supply"
  • AC Disconnect: A red and white placard riveted to the disconnect: "On-site Generation Utility Disconnect Switch"
Electrical Stamp Required
0
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Label Page Notes


Website
link
Phone
(352) 569-9955

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
109258
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with SECO Energy before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.