Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Gulf Power

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
2
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs
**Inverter:**
The Facility shall include a utility-interactive inverter or other devices that performs the function of automatically isolating the Facility from the Company’s electric system in the event the Company’s electric system loses power. The inverter shall be considered certified for interconnected operation if it has been submitted by the manufacturer to a nationally recognized testing laboratory to comply with UL 1741.
**AC Disconnect:**
- As a Tier 1 generator, the Customer is not required by law to install a manual disconnect switch of the visible load break type. Nevertheless, the Company strongly recommends the installation of such a disconnect switch.
- Tier 2 and Tier 3 projects are required to install a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the Facility and the customer wiring connected to the Company’s system
Electric Service Reqs
** System Sizing: **
May not exceed 90% of the Customer’s utility distribution service rating (transformer)
Rate Schedule Link
link
Website
link
Phone
(877) 655-4001

Other details

Restrict Inspection
0
Address ID
112310
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Gulf Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.