FPUC - Florida Public Utilities

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

During any billing cycle, excess customer-owned renewable generation delivered to the Company’s electric grid shall be credited to the Customer’s energy consumption for the next month’s billing cycle. Energy credits produced pursuant to Section (12) (e) shall accumulate and be used to offset the customer’s energy usage in subsequent months for a period of not more than twelve months. At the end of each calendar year, the Company shall pay the Customer for any unused energy credits at an average annual rate based on the Company’s COG-1, as- available energy tariff.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The max system size for a Tier 1 application is 10 kW AC or 11.76 kW DC

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Rate Schedule Link
link
Website
link
Phone
(800) 427-7712

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
112503
Express Planset Eligible
Yes