Duke Energy (FL)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeAnnual
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
- Customer net excess generation (NEG) is carried forward at the utilities retail rate (i.e. as a kilowatt-hour credit) to customers’ next bill for up to 12 months. At the end of the 12-month billing period, the utility pays the customer for any remaining NEG at the utility’s avoided-cost rate.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- No
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- No
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
All Jobs:
- Add fence/gate on site plan
- Do NOT indicate the state after the utility's name anywhere in the plans. It must read as "Duke Energy" not "Duke Energy (FL)"
- SLD Reqs
All Jobs:
- The utility account holder's name has to reflect on the SLD
- AC DISCONNECT SHOULD BE LABELED: "GENERATION DISCONNECT SWITCH"
Existing Systems:
- list the size of the existing system on the SLD
- Install Reqs
- Call Before You Dig: 72 hours prior to digging, please
- Placards
- Electrical Stamp Required
- No
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Site Plan Notes
- Label Page Notes
- Cover Page Notes
- Electrical Diagram Notes
- Rate Schedule Link
- link
- Website
- link
- Phone
- (866) 233-2290
Other details
- Revision Required
- No
- Mod Swap Requires Planset
- Yes