City of Wauchula
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- Changes monthly
- Net Excess Generation Notes
Electric energy from the customer-owned renewable generation system shall first be used to serve the customer's own load and offset the customer's demand for the City electricity. Any kWh of electric energy produced by the customer-owned renewable generation system that is not consumed by the customer's own load and is delivered to the City system shall be deemed as "excess customer-owned renewable generation." Excess customer-owned renewable generation shall be purchased by the City in the form of a credit on the customer's monthly energy consumption bill. The credit from the City shall be determined in accordance with the wholesale avoided cost paid by the City.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Inverter Oversize Restrictions
- 0
- System Offset Notes
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (863) 773-3131
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 15641088
- Express Planset Eligible
- Yes