City of Quincy Utilities
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
- Electric energy from the customer-owned renewable generation system we shall first be used to serve the Customer’s own load and offset the Customer’s demand for the City of Quincy electricity. Any kWh of electric energy produced by the customer-owned renewable generation system that is not consumed by the Customer’s own load and is delivered to the City of Quincy system shall be deemed as “excess customer-owned renewable generation.”
- Excess customer-owned renewable generation shall be purchased by the City of Quincy in the form of a credit on the Customer’s monthly energy consumption bill. Each billing cycle, Customer shall be credited for the total amount of excess energy generated by the customer owned renewable generation that is delivered to the City of Quincy’s electric system during the previous billing cycle. The credit from the City of Quincy shall be determined at a rate equal to the City of Quincy’s wholesale avoided cost.
- If a given credit for excess customer-owned renewable generation exceeds the total billed amount for Customer’s consumption in any corresponding billing period, then the excess credit shall be applied to the Customer’s subsequent bill. Excess energy credits produced pursuant to the preceding sentence shall accumulate and be used to offset Customer’s energy consumption bill for a period of not more than twelve (12) months. In the last billing cycle of each calendar year, any unused excess energy credits shall be paid by the City of Quincy to the Customer, at the City of Quincy’s wholesale avoided cost rate.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Max System Size: 100 kW GPR (GPR = DC Size * 0.85) or 100% offset
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
Plans & docs
- Site Plan Reqs
- AC Disconnect is required to be accessible to the utility 24/7
- SLD Reqs
- AC Disconnect required
- Website
- link
- Phone
- (850) 618-0020
Other details
- Restrict Inspection
- 0
- Address ID
- 1221297
- Express Planset Eligible
- Yes