City of Newberry Utility (FL)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
"Customer-owned renewable generation shall first be used for Customer’s own load, and shall offset Customer’s demand for electricity from ARP Participant. Excess customerowned renewable generation that is not used for Customer’s load shall be delivered to ARP Participant’s electric distribution system. Excess customer-owned renewable generation delivered to ARP Participant’s electric distribution system shall be recorded separately from electricity delivered to Customer from ARP Participant. Customer shall be charged for electricity delivered to Customer by ARP Participant in accordance with the otherwise applicable retail rate schedule. Excess customer-owned renewable generation shall be credited by ARP
Participant on Customer’s monthly electric consumption bill at a rate determined by FMPA, which shall be calculated in accordance with Appendix B, which is attached to this Policy"
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
- Temporary Disconnect Reconnect Process (TDR) “Temp Disconnect” $45 during working hours $75 after hours.
TDR - Who to Contact Building Department
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- "The Customer must install, at their expense, a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the customer-owned renewable generation system and any Customer wiring connected to City of Newberry system
The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter. The Customer must install, at their expense, a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the customer-owned renewable generation system and any Customer wiring connected to City of Newberry system
The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter. "
- Install Reqs
ARP Participant shall cause to be installed metering equipment at the point of delivery capable of recording two separate meter readings: (1) the flow of electricity from ARP Participant to the Customer, and (2) the flow of excess electricity from the Customer to ARP Participant. ARP Participant shall take meter readings on the same cycle as the otherwise applicable rate schedule.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (352) 472-7026
Other details
- Restrict Inspection
- 0
- Address ID
- 606285
- Express Planset Eligible
- Yes