City of Leesburg Electric Department
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.05
- Solar Export Value Notes
- $ 0.05 per kWh as of 2022 https://www.leesburgflorida.gov/services/electric/solar.php
- Net Excess Generation Notes
Excess customer-owned renewable generation shall be delivered to the Utility’s electric distribution system. For purposes of this Agreement, the term “excess customer-owned renewable generation” means any kWh of electrical energy produced by the customer-owned renewable generation system that is not consumed by Customer and is delivered to Utility’s electric distribution system. FMPA agrees to purchase and receive, and Customer agrees to sell and deliver, all excess customer-owned renewable generation at the energy rate established by FMPA, which shall be calculated in accordance with Appendix B. Excess customer-owned renewable generation shall be purchased in the form of a credit on Customer’s monthly energy consumption bill from Utility.
In the event that a given monthly credit for excess customer-owned renewable generation exceeds the total billed amount for Customer’s consumption in any corresponding month, then the excess credit shall be applied to the subsequent month’s bill. Excess energy credits produced pursuant to the preceding sentence shall accumulate and be used to offset Customer’s energy consumption bill for a period of not more than twelve (12) months.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
1. All a Service Planner at , extensions 2020, 2021 or 2026, or email at Electric Service Planners, prior to starting any work.
2. They will meet you onsite to determine if any additional work may be required.
3. The Service Planner will complete a “Service Request” form which will be needed at Customer Service to pay all applicable fees. The form must also be presented at the City of Leesburg Building Department to obtain a permit.
4. After all, fees are paid, and permits are secured, the customer can call our Dispatchers at to schedule disconnect/reconnects for an Electric Service upgrade. Please call a minimum of 72 hours ahead of time to get placed on the schedule.
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Relay Meter Orientation = Over/Under
Production Meter Required.
Show The production meter must be in the one-line EXACTLY as the diagram (See attached)
The feed-in from the solar must come in the top, and the feed out to the panel must go out the bottom.
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Site Plan Notes
We can only have one solar production meter per home
- Website
- link
- Phone
- (352) 728-9786
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 111868
- Express Planset Eligible
- No