CFEC - Central Florida Electric Cooperative

Florida Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
Post Solar Billing Method
Net Metering
Rebates Offered
No

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Electric Service Reqs

**Disconnect: **


* install and maintain a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the SPS and any Customer facilities connected to the Cooperative's electrical system.

* The manual disconnect switch shall be mounted separate from the meter socket and shall be readily accessible at all times to the Cooperative and shall be capable of being locked in the open position by the Cooperative.


**Equipment Certifications: **


* Customer shall, prior to connection and operation, provide equipment specifications to the Cooperative identifying and certifying in writing that the SPS, Inverters and associated equipment design, installation and operation adheres to IEEE-1547 Standards, UL-1741 Standards, the National Electric Code, and has been approved by the Florida Solar Energy Center (FSEC Std 203-05).

Website
link
Phone
(844) 434-3962
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with CFEC - Central Florida Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.