Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Newark Electric Department

Delaware Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Solar Export Rate
0.14
Net Excess Generation Notes

Summer - $17.50 customer charge $0.1720 per kWh

Winter - $17.50 customer charge $0.1520 per kWh

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
110
Offset Calculation Basis
Average
Offset Calculation Period
24
Industry Standard Watts Sqft
2
System Offset Notes

The initial design load shall be the calculated average of the two previous twelve-month periods of actual electric usage at the time of installation of electric generating equipment.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link
Phone
(302) 366-7000

Other details

Restrict Inspection
0
Address ID
211136
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Newark Electric Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.