DE - City of Seaford

Delaware Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Net Metering
Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

You can go 10% over your 2 year average load.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

A socket based ringless meter socket. If it is a large system, you would have to supply a CT cabinet.

You install the meter socket, we supply and install the meter.

Allowed Meter Adapter
None

Plans & docs

Website
link
Phone
(302) 629-9841

Other details

Restrict Inspection
0
Address ID
211350
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with DE - City of Seaford before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.