SNEW - South Norwalk Electric and Water
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The electricity generated by the customer exceeds the electricity supplied by SNEW, the customer shall be billed for the applicable monthly service charges, and the balance of the electricity generated shall be carried into the following billing period and appear as a credit on the customer’s account. Credits will be carried forward until the customer’s consumption offsets the excess energy or the end of the 12-month true-up period is reached. At the end of the 12-month true-up period, any unused energy (kWh) credit accumulated during the previous 12 months will be reimbursed to the customer of record in the form of a check. The 12-month net-metering true-up period shall last from April 1 through March 30 of each year. No credits will be carried past March 30 into the succeeding annual true-up period.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Eversource allows Interconnection Applications to be submitted under Rider N- Class 1 up to 2000 kW. Eversource does not use usage history in determining eligibility for an Interconnection Application. Eversource uses the total AC Nameplate of all inverters to determine system size when evaluating an application that has been submitted.
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
The Site Plan shows how the exhaust of the owner’s DR system shall not adversely impact SNEW EDS, its workers and its work areas
The Site Plan that the DR system is not installed over SNEW’s EDS or SNEW equipment
The Site Plan showing all enclosures, fencing and screening
The Site Plan showing the DR system, batteries, solar arrays, generators, meter, switches, protective devices and connection to SNEW’s EDS
- SLD Reqs
No Production Meter Required
A one-line Electrical Schematic of the DR system, batteries, solar arrays, generators, meter, switches, protective devices and connection to SNEW’s EDS
- Install Reqs
A lockable, load break rated (double pole-double throw), visible break Disconnect Switch with safe working clearances shall be installed for all DR systems at all times on the outside wall of the owner’s dwelling, easily accessible to SNEW personnel at all times.
- Website
- link
- Phone
- (203) 866-3366
Other details
- Restrict Inspection
- 0
- Address ID
- 157163
- Express Planset Eligible
- Yes