Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Bozrah Light & Power

Connecticut Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
General site plan of the proposed installation
SLD Reqs
A one-line electrical schematic drawing(s) depicting the completeproposed system design. The drawing(s) must show all electricalcomponents and protective relaying proposed for the installation.
Install Reqs
Category 1 and 2 Installations: The electric service shall bemetered for revenue purposes primarily using two watt-hourmeters with detents or, if feasible, one two-channel, electronic,solid state meter that is capable of measuring bi-directional powerflow.
Website
link
Phone
(860) 886-9016

Other details

Restrict Inspection
0
Address ID
135777
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Bozrah Light & Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.