Yampa Valley Electric Association
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Net-metering is the process whereby energy usage and generation is resolved. This is an automated process through YVEA's revenue meters. For any generation above a given month's usage, the Producer will retain a credit and this credit will be applied to their next months bill. At the end of the calendar year, the Producer will be paid at the current rate for any generation above their usage of the previous year.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- IN the plan set, include the Data and calculations for determining PV system size (historical usage, new loads, anticipated PV system production)
- Site Control Documentation required, this can either be the the installer contract with utility bill owner -or - or the county record with a Parcel ID that shows the members name on it, that also matches the interconnection application. Typically, the county record is a google earth overview with the Parcel ID/description overlaid on top.
- For site diagram, include relative location of generator, inverter (if applicable), AC disconnect switch, utility revenue meter, main service panel, and transformer.
- Please provide a document that will fulfill this requirement: Operational Testing Procedure: This should show what we should expect from the inverter when we simulate a grid outage.
- SLD Reqs
- Production meters not required
- For one-line diagram, include lengths and sizes for all conductors, maximum power rating for generator, ratings of interrupting breakers, DC and AC disconnects, ratings of inverters (if applicable), distance of inverter from utility meter, any applicable protection (relays, etc.), and other components when applicable.
- IF distance between inverter and meter is greater than 50 ft., Voltage calcs required.
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (970) 879-1160
Other details
- Restrict Inspection
- 0
- Address ID
- 173939
- Express Planset Eligible
- Yes